Raised Bed Soil Calculator
Find the exact cubic feet of soil mix your bed needs.
Use ToolFree calculator
Average depth across a taper, cubic yards with settle allowance, bags, delivered tons and cost for terracing or filling a slope.
Chlorova · updated for 2026
Quick samples
Click “Calculate” to see your results.
Weights and prices are typical landscape-supply midpoints, and every yard varies by moisture, source and screen size, so a wet winter load of topsoil can weigh well past the figure printed here. The average-depth method is exact for a straight taper and approximate for a compound slope, so measure a stepped run as separate strips rather than trusting one depth pair. Settle allowance covers shrink after placement, not compaction under traffic, and a terrace footing of gravel should be tamped in lifts regardless of what the order line suggests. Get the delivery drop site agreed in writing, because a truck that cannot reach your slope tips its load where it can.
Ordering soil for a slope is the landscaping arithmetic that fails twice: depth is never constant across the run, and the volume you measured shrinks once the material settles. A terrace that reads two inches at the top and eight at the toe averages five, and that single average is the whole calculation. This tool converts length, width and a taper into cubic feet and yards, adds a settle allowance, and returns bags, delivered tons and a bill for the delivery day.
A taper from two to eight inches is a triangular prism, and its volume equals area times the mean of the two depths, so five inches is the number that matters. Two hundred square feet at five inches is 200 times 5 twelfths, or 83 cubic feet, which divides to 3.09 cubic yards in place.
Settle allowance multiplies that figure rather than the depth, because shrink happens to the pile you order, not the pile that ends up on the slope: ten percent turns 3.09 into 3.40 cubic yards to buy. Weight follows from a per-yard density, 2,400 lb for topsoil, so the load lands near 4.1 tons. Cost is ordered yards times price plus a flat delivery charge, which is why a small job carries a stubbornly large per-yard unit price.
Typical landscape-yard figures for screened bulk material delivered in moderate quantity. Pounds per cubic yard drive the tonnage line, and the shrink column is the settle allowance this calculator applies to your order volume rather than to the depth you measured.
| Material | lb per cu yd | Typical $/cu yd | Settle allowance | Best used as |
|---|---|---|---|---|
| Sand | 3000 | 28 | 5% | Drainage layer |
| Crushed gravel | 2900 | 30 | 5% | Terrace footing |
| Topsoil | 2400 | 35 | 10% | Planting fill |
| Raised-bed mix | 1500 | 55 | 8% | Deep bed lift |
| Compost | 1000 | 45 | 20% | Thin soil amendment |
| Bulk mulch | 500 | 40 | 15% | Surface cap |
Reach for it whenever a fill depth changes across a run: terracing a bank, cutting steps into a slope, building drainage backfill behind a retaining wall, or lifting beds along a gradient. For a level bed of uniform depth, the raised-bed soil and bulk bagged material tools are the quicker paths, and the mulch depth calculator handles a flat top-dressing. Use this one the moment you have a thin edge and a deep edge to reconcile.
Multiply length by width to get area, then multiply by the average of the shallow and deep depths. Convert cubic feet to cubic yards by dividing by 27, and add your settle allowance to that figure before ordering, since the pile shrinks after placement.
About 5% for sand and crushed gravel, which compact rather than shrink, and 10% for topsoil. Compost and mulch lose the most volume, so allow 15 to 20%, and a raised-bed blend sits in between at roughly 8%.
Screened topsoil runs near 2,400 lb per cubic yard when dry, and wet material can push past 3,000. That is why the tonnage line matters on a slope: three yards is over four tons, and it arrives in one drop that you cannot easily move again.
Bulk wins once you need more than about two cubic yards, because a bagged 1.5 cu ft load costs several times the delivered per-yard rate. Below that, and where a truck cannot reach, bags or a trailer pickup are usually the sensible answer despite the unit price.
Yes, treat the backfill as a strip whose length runs along the wall and whose taper follows the drainage layer. Gravel is the right material selection there, and remember to compact it in lifts rather than pouring the full depth behind the wall at once.
Because the volume figure was measured loose in the truck and then consolidated under rain and foot traffic, which is exactly what the settle allowance is meant to cover. Order with the allowance, soak the fill before planting and top up the shallow end rather than re-buying the whole run.
On a slope, keep each lift under roughly four inches of soil and firm it before the next, since deep unbonded fill creeps downward and cracks. A foot of fresh soil on a bank is better placed over several days than in one afternoon.
Chlorova Gardening Team
Builds, checks and documents every tool we publish
Chlorova editorial review
Checked against extension-service publications
Find the exact cubic feet of soil mix your bed needs.
Use ToolCompare the real cost of buying compost, mulch or soil by the bag versus a delivered bulk yard.
Use ToolBlock count, capstones, weight and drainage stone for a segmental retaining wall from length and height.
Use ToolSize a rain garden or swale from roof runoff and soil infiltration, with required bed area, overflow, drain time and a planting count.
Use Tool